ADDRESS: 1002 Childs Way University Park Campus Los Angeles, CA 90089
AREA SIZE: BASEMENT 8,100 SF | FLOOR ONE 1,000 SF
TIME TAKEN TO COMPLETE: 141 Days
ZERO LOST-TIME INCIDENT RATE: Zero Impact to Attending Workers.
HIGHLIGHTS: Installation of specialized surface materials facilitates easy cleanup and maintenance, minimizing the risk of contamination and ensuring ongoing operational efficiency.
This project involves installing and coordinating tools, equipment, and infrastructure for a cleanroom in the basement and Hazardous Processing Material (HPM) Rooms on level 1. Our work includes routing connections to existing utilities and adhering to industry standards for air filtration, temperature control, humidity levels, and surface materials, ensuring optimal cleanliness and functionality year after year.