ADDRESS: 3355 E La Palma Ave, Anaheim, CA 92806
TIME OF COMPLETION: 156 Days
ZERO LOST-TIME INCIDENT RATE: Zero Accidents
HIGHLIGHTS: Integration of modern drainage systems and turf technology, ensuring optimal playing conditions and minimizing rain delays.
This project involves the transformation of existing grounds into a premier baseball field, meticulously designed to meet the needs of players. Key features include the installation of modern turf technology and drainage systems to ensure optimal playing conditions in all weather conditions, as well as the integration of energy-efficient lighting for evening games and practices.
Comentários